Size and capacity, if different (see 3.8).
aa.
Additional performance requirements, specify (see 3.9.1).
bb.
Equipment other than standard, if required, specify (see 3.11).
cc.
Optional equipment, if required, specify (see 3.12).
cc.
Repair parts, specify requirements (see 3.13).
ee.
Lubrication chart or plate, if different, specify (see 3.14.1).
ff.
Nameplate, if different, specify (see 3.14.2).
gg.
Hour meter, delete if not required (see 3.15).
hh.
First article inspection, if different specify (see 4.4).
ii.
Quality conformance inspection, if different, specify
jj.
(see 4.5).
kk.
Level of preservation, packing, and marking, if different
(see 5.1).
6.2.2 Contract data requirements. All data requirements (parts lists..
wiring diagrams, operating manuals, maintenance manuals, alignment and test
results) shall be requested on a DD Form 1423, Contract Data Requirements
List, and shall be furnished in accordance with each specified DD Form 1664,
Data Item Description, as shown on the DD Form 1423.
6.3 First article.
When first article inspection is required, the item
to be tested should be the first item offered for acceptance under the
contract.
The contracting officer should include specific instructions in
acquisition documents regarding arrangements for examination, test and
approval of the first article.
6.4 Safety and health requirements. Paragraph 3.2.5 requires compliance
only with those OSHA requirements that concern the machine itself.
It does
not require compliance with those OSHA requirements that concern "the
machine in its operating environment" such as noise levels, radiation
levels, electromagnetic emissions, noxious vapors, air contaminants, and
heat.
Since OSHA limits the total hazard level of these hazards in the
environment (and does not limit the hazard level of individual machines in
the environment) the procuring activity is advised to analyze the existing
hazard levels in the proposed operating environment, and specify additional
machine requirements that will integrate the new machine into its future
operating environment.
The machine shall be equipped with all point-of-
operation guarding normally furnished as standard on the manufacturer's
commercial machines supplied to the commercial market.
If specific point-
of-operation guarding is required, the procuring activity should specify the
22